Harper Mill Crossing: A grocery-anchored center whose opening date had already been advertised before the slab was poured.
All work

Harper Mill Crossing

Sector
Commercial & retail
Region
Marrow Valley
Building area
82,000 sf
Year
2024
Status
Complete

Self-performed on this job

White — proposed excavation
  • Site earthwork
  • Offsite roadway
  • Paving

Everything above was built by our own crews and equipment. When the ground turned up something the drawings did not show, the superintendent redirected them that morning.

What was hard

The anchor's opening date was public before the slab was poured, and the intersection improvement the center depended on sat with the state highway district.

What we did

We built the anchor and the offsite roadway as two independent critical paths with our own crews on the roadway package, so a delay in the state's review could not stop the building.

What it produced

The anchor opened on the advertised date. The signal went live three weeks later without affecting occupancy.

On this project

Building area
82,000 sf
Delivery
General contract
Pad sites
4
Opening
On advertised date

Scope

  • General contract delivery
  • Site earthwork and paving
  • Offsite roadway and turn lanes
  • Storm and water quality structures
  • Anchor shell and tenant coordination
  • Pad site delivery

Next project

Alder Street Transit Facility

Civic & institutional · Fairhaven metro

Have a site like this one?

Send the boundary or the address. We will tell you what it can hold and what stands between here and approved.