Skip to content
Halloran Construction
Northgate Commerce Park: A multi-building commercial park delivered in three phases while the first phase was already occupied.
All work

Northgate Commerce Park

Sector
Commercial & retail
Region
Fairhaven metro
Building area
148,000 sf
Year
2024
Status
Complete

Self-performed on this job

White — proposed excavation
  • Site earthwork
  • Site utilities
  • Slabs and paving

Everything above was built by our own crews and equipment. When the ground turned up something the drawings did not show, the superintendent redirected them that morning.

What was hard

Phase one tenants moved in before phase three broke ground, which put construction traffic, cranes, and a live customer entrance on the same drive aisle.

What we did

We rebuilt the site logistics plan around the occupied phase rather than the construction sequence: a separate construction entrance, hard barrier through the shared aisle, and the noisy concrete pours moved to before opening hours.

What it produced

Three phases delivered with the occupied buildings trading throughout and no customer-facing closures.

On this project

Building area
148,000 sf
Delivery
Design-Build
Phases
3
Closures
None

Scope

  • Design-build delivery
  • Site earthwork and paving
  • Site utilities
  • Building pads and slabs
  • Shell construction and tenant coordination
  • Phased site logistics

Next project

Harper Mill Crossing

Commercial & retail · Marrow Valley

Have a site like this one?